Mobile
Log In Sign Up
Home > english-chinese > "trunk sewer" in Chinese

Chinese translation for "trunk sewer"

排渣地沟
污水干渠;污水干管
污水总管
下水干道


Related Translations:
building sewer:  房屋污水管
trunk cord:  躯部脊索
trunk port:  中继线端口
record trunk:  记录中断线记录中继线记录总线
trunk expansion:  中继线扩充
carrier trunk:  载波中继
recording trunk:  记录信息通路记录中继线电路
reserve trunk:  备用中继线
toll trunk:  长途中继线
costocervical trunk:  肋颈干
Example Sentences:
1.Yuen long and kam tin sewerage and sewage disposal - kam tin trunk sewerage phase 1 and au tau trunk sewers
元朗及锦田污水收集系统及污水排放设施锦田污水干渠收集系统第1期及凹头污水干渠工程
2.Supplementary information on 215ds - yuen long and kam tin sewerage and sewage disposal - kam tin trunk sewerage phase 1 and au tau trunk sewers
补充资料215ds元朗及锦田污水收集系统及污水排放设施锦田污水干渠收集系统第1期及凹头污水干渠工程
3.Stage 2 of the project was initiated in 1997 , and the trunk sewer further extended in range so that public sewer connection became available for many more village communities
1997年,第二期工程正式推行,污水主干渠的覆盖范围进一步扩大,使许多乡村得以接驳至公共污水系统。
4.Apart from the construction of the treatment plant , the work will also include the construction of a 200 - metre - long trunk sewer of about 500mm in diameter for connection to the public toilets and cable car terminal and associated tourist developments in the area
除建造昂坪三级污水处理厂外,工程并包括兴建长约200米、直径500毫米、接驳至昂坪的公厕及昂坪吊车站和相关旅游发展项目的污水干渠。
5.Second , based on the characteristic of the receiving water studied in this paper , develope a dynamic one - dimension water quality model for nanbei river in zhangcha town of foshan city , and develope a program of water quality model based fortran powerstation . and then , calculate the concentration of codcr in receiving water using the simulation results of swmm and analyze the effect on the environment of receiving water by intercepting ratio . at last , the construction investment and operational and administrative expenses of intercepting trunk sewer 、 pumping station and sewage farm is calculated and the relation between them is discussed
其次,本文根据研究区受纳水体的特点,建立了佛山市张槎镇南北大涌的一维非稳态水质模型,相应地开发了基于fortranpowerstation平台的水质模型计算程序,并在swmm模型模拟结果的基础上,利用本文编制的水质模型程序计算了不同截流倍数时南北大涌codcr浓度的时空变化过程,分析了截流倍数对河涌水环境质量的影响。
Similar Words:
, "trunk selector" Chinese translation, "trunk self-loocable" Chinese translation, "trunk service" Chinese translation, "trunk service observation schedule" Chinese translation, "trunk sewer reticulation system" Chinese translation, "trunk shelf" Chinese translation, "trunk show" Chinese translation, "trunk side bend" Chinese translation, "trunk sideward bending" Chinese translation